|
Power plant design and global execution
 |
Monday, June 12
TR06 - 9:00 a.m. – 11:00 a.m.
TR02 - 11:30 a.m. – 1:30 p.m.
Tour enrollment limited to 25 people
A bus will pick up at the Coronado Springs Resort 45 minutes prior to tour time. The on-site visit will run approximately two hours. The bus will depart immediately upon the conclusion of the tour for return to the Coronado.
|
| SGT6-5000F engines during assembly |
Siemens Power Generation is one of the world’s leading specialists in planning, construction, and upgrades of power plants. Services include development, production, and supply of components and systems; comprehensive plant services, I&C solutions and energy management systems; fuel cells, turbines, compressors and full-scope solutions for industrial plants.
Siemens’ Orlando facility is the Americas headquarters for the design of gas and steam turbine power generation equipment. Siemens’ requirement for a high degree of interdisciplinary integration and global collaboration on design and execution of projects were key drivers in their selection of the Intergraph Process, Power & Marine SmartPlant® software portfolio. Applications range from SmartPlant Foundation for information and workflow management to the engineering and design tools such as SmartPlant 3D and SmartPlant P&ID. |
 |
| Siemens Orlando Headquarters - Quad 1 |
Tour participants will learn about Siemens Power Generation’s strategy for the future of power plant design and global execution. Siemens engineers will conduct a demonstration of Siemens systems, built on Intergraph’s SmartPlant Enterprise.
This tour is only available to registered attendees. If you have not yet registered, click here to do so. If you have already registered for the conference, please send an email to intergraph2006@intergraph.com, be sure to include your confirmation number and the number of the tour you wish to attend.
|